keane
No Comments

Bridge closed as work carries on through the night

What started out last week as just four orange lines on the pavement covering one square metre, has developed into a full scale "work in progress" involving many men, lots of machines and now the main road and bridge closed as work carries on through the night.

Decrease Font Size Increase Font Size Text Size Print This Page

Part of the old drain system of Barga Vecchia has been gradually failing for some time and the pavement between the old city and the bridge to the new town was started to subside slightly as ground settled on the collapsing ancient channels.

There was talk in the city that the bridge was in difficulty and was maybe subsiding but that was quickly ruled out – the real problem was the collapsed drains but as the work progressed and the holes gradually got larger  (article here) it became clearer that part of the problem was also the roots from the two trees either side of the Red Telephone Box which were invading  and clogging up the broken drains.

It could well be that they are living on borrowed time and could be removed  – hopefully to be replaced by trees of another type with a smaller root system.

This evening the work continued through the night as the main road was closed to traffic and traffic lights set up allowing motorist to pass over the old bridge. 

Loading Facebook Comments ...

You must be logged in to post a comment Login